THE PROJECT

With the current 300m long wall failing and not constructed to design, TDK Civil was engaged to retrospectively upgrade the wall to design standards. Works included the removal and replacement of various posts, upgrading all sleepers while managing existing fences and residential assets, install appropriate drainage and reinstate the surrounding area. Following these works TDK Civil was then engaged to build a new 70m long retaining wall in front of an existing retaining wall that was also showing signs of overloading